California Custom Processing - Madera, CA

2.3 MW solar steam facility for almond pasteurization. The project will achieve a 50% reduction of natural gas consumption on an annual basis and 100% reduction during clear sky conditions.

Accomplishment: Currently under construction. Sunvapor performing engineering, procurement, and construction management


Pacific_Ethanol1.jpg

Pacific Ethanol - Madera County, CA

5 MW solar steam for ethanol distillation. In the seven acre site plan, pressurized water circulates through a solar field of parabolic trough collectors. There is no risk of flammability.

Accomplishment:  Engineering completed and permit issued